Trenching
Trenching
Removing Sod
Cutting Into Galvanized Main Line
Galvanized Deterioration
Applying Pipe Dope To Main Line Fittings
Stop And Waste
Stop And Waste Main Line Connection
Flush Main Line And Measure GPM
Stop And Waste Access
Round Box To Cover Stop And Waste Access
Backflow Assembly
Backflow Assembly
Valve Manifold and Backflow
Cutting Valve Box To Fit Around Manifold
Cutting Valve Box To Fit Around Manifold
Wiring
Wiring
Setting Valve Box
Sprinkler Lateral Gluing, With Glue Primer Mix Male End
Sprinkler Lateral Gluing, With Glue Primer Mix Female Fitting
Lateral Gluing, Fitting Glue Joints Together
Driving PVC Under Cement Walkway
Driving PVC Under Cement Walkway
PVC 3/4 inch Tee
PVC 3/4 inch Tee and 45 Degree Elbow
Cutting Swing Pipe To Length
Assembling Swing Joint And Sprinkler Head
Setting Sprinkler Head